01/2022 SUBMARINE CABLE LAYING

FIJI

VITI LEVU, SAVUSAVU & LAU GROUP

CHARTS BA1674, BA 2691, BA4605

1. SUBMARINE CABLE LAYING OPERATIONS BY ILE DE RE IN PROGRESS UNTIL 27 FEB 2022 ALONG TRACK JOINING THE FOLLOWING POSITIONS:

A. 18–07.91S 178–28.28E

B. 18–09.34S 178–30.35E

C. 18–11.80S 178–34.17E

D. 18–26.57S 178–46.62E

E. 18–37.49S 179–12.80E

F. 19–08.50S 179–59.64W

G. 19–09.21S 179–38.67W

H. 19–20.51S 179–28.79W

I. 16–48.66S 179–20.53E

J. 16–58.09S 179–24.54E

K. 17–13.64S 179–35.98E

L. 17–27.75S 179–36.00E

M. 18–10.59S 179–57.66E

N. 18–20.60S 179–58.75W

O. 18–41.97S 179–42.31W

P. 19–00.30S 179–32.61W

Q. 19–01.58S 179–26.04W

R. 18–53.94S 179-19.88W

S. 18–32.31S 179–03.88W

T. 18–15.99S 178–57.51W

U. 18–07.23S 178–56.51W

V. 17–46.12S 178–29.35W

W. 17–37.17S 178–19.44W

X. 17–25.22S 178–05.78W

Y. 16–32.08S 177–45.32W

Z. 15–45.48S 177–29.39W

2.  ALL SHIPS IN VICINITY ARE REQUESTED TO GIVE 2.5 MILES CLEARANCE.

Scroll to Top